On a sunny Sunday morning, our crew of three men and one woman showed up about 10am ready to install the five roof panels to complete our south Reno Envirohaven™. Our green building crew did this without the assistance of any mechanical equipment.
![2014-01-19 11.00.25 Snipped](https://www.envirohaven.com/wp-content/uploads/2014/01/2014-01-19-11.00.25-Snipped-300x224.jpg)
They used straps to help pull the Envirohaven™ panels into place with posts to keep them in place until the adjoining panels could be secured.
![2014-01-19 11.16.43](https://www.envirohaven.com/wp-content/uploads/2014/01/2014-01-19-11.16.43-300x225.jpg)
By 2pm, they were ready to go watch the NFL play off game!